Hubco Green Limited - Attock Petroleum Hakla (South Bound)

Islamabad-Peshawar Motorway · Hakla

Fast DC · 120 kWRs 110 / kWhHubco Green
PriceRs 110per kWh
Power120 kWDC fast charging
PlugCCS21 connector
HoursNot confirmedOpen to the public

This station.

Hubco Green Limited - Attock Petroleum Hakla (South Bound) is a DC fast-charging station in Hakla, run by Hubco Green. It has 1 connector (CCS2) with up to 120 kW. The listed price is Rs 110 per kWh.

  • CCS2120 kW DC

While you chargeWashroom · Petrol station

Checked by Zvolta on 29 October 2026. Run by Hubco Green, not Zvolta.Report a change

Help keep this listing right.

Charged here recently, or run this station? Tell us what's changed. Our team checks every report before updating the page.

Report a change

Prefer WhatsApp? Message +92 310 4446529

Before you go.

How much does charging cost at Hubco Green Limited - Attock Petroleum Hakla (South Bound)?

The listed price is Rs 110 per kWh. A typical top-up of 36 kWh (a 60 kWh car from 20% to 80%) costs about Rs 3,960. Prices can change; check at the charger.

How long does charging take here?

With up to 120 kW DC, a typical 60 kWh car takes about 25 minutes to go from 20% to 80%, if the car accepts that speed.

Which plugs are available?

CCS2. CCS2 is the DC fast plug most new cars in Pakistan use.

Charge on the Zvolta network

Find Zvolta stations, see which chargers are free, and pay from your wallet. Bikes, rickshaws and cars.